中日韩视频在线观看,经典三级久久久久,国产午夜亚洲精品不卡,久久思思精品-亚洲精品国精品久久99热一,国产精品免费大片,激情,中文,日韩,,最近最好的中文字幕免费

Company News
Group II won the bid for Shouguang Road Project
&On May 25, 2016, the second company of the group won the bid for the second bid section of Shouguang NANDA Road (Yanglin road Binhai boundary section) maintenance and reconstruction project. The total length of the maintenance and reconstruction project is about 9.891km, and the pavement width is 10-12m. It starts from the coastal boundary in the East and ends at the intersection of Yanglin road and NANDA road in the West. Construction period: May 30, 2016 to November 30, 2016, 185 calendar days in total. The technical standard is the standard construction of class II Highway, with the design speed of 60km / h; the design vehicle load grade of bridge and culvert is highway-i, the design flood frequency is 1 / 50, and the basic seismic intensity is VII. At present, the preparatory work before the commencement has been carried out in an all-round way.